Case Studies

Montreal-Area Municipal Flood Protection

The Challenge

Recurring flood risk to municipal properties and residential areas across several Montreal-area boroughs required a pre-positioned, professionally managed flood defence capability.

The Solution

Custom-engineered Defender Flood Kit packages utilizing Eco-Dam and Muscle Wall systems were delivered to each site with five-year deployment contracts. Defender East manages annual inspections, exercises, and active flood response.

The Outcome

Turnkey flood protection systems in place at multiple municipal locations. Three active five-year deployment contracts secured.

Vernon Regional Airport

The Challenge

Severe flooding caused a runway washout, requiring site isolation for bank re-stabilization and sub-base reconstruction without causing further environmental damage.

The Solution

Eco-Dam deployed for full site isolation, creating a stable work envelope for bank re-stabilization and reconstruction crews.

The Outcome

Runway infrastructure restored. Site isolation maintained with minimal environmental footprint.

Construction Site Dewatering

The Challenge

The work area required continuous dewatering over a 30-day period to enable a concrete outcropping installation project.

The Solution

The work area required continuous dewatering over a 30-day period to enable a concrete outcropping installation project.

The Outcome

The work area required continuous dewatering over a 30-day period to enable a concrete outcropping installation project.

Winter Pipeline Repair

The Challenge

Pipeline A full river diversion was required for a pipeline repair in -20°C winter conditions, with all work required to be completed within 30 days.

The Solution

Pipeline A full river diversion was required for a pipeline repair in -20°C winter conditions, with all work required to be completed within 30 days.

The Outcome

Full river diversion completed in under 30 days with minimal environmental impact. Defender’s cold-weather operating capability confirmed under demanding field conditions.

Pipeline Integrity Dig in Protected Wetlands

The Challenge

A pipeline integrity excavation in environmentally protected wetlands required full site isolation and dewatering without disturbing the surrounding ecosystem.

The Solution

Aqua-Barrier systems deployed to isolate the dig site with continuous dewatering maintained throughout. Equipment placement coordinated to meet all environmental protection requirements.

The Outcome

Integrity dig completed in full environmental compliance. Wetland ecosystem undisturbed.

Wetland Flood Mitigation and Creek Diversion

The Challenge

Vegetation accumulation in local wetlands was restricting water volume capacity, increasing flood risk. Work was required in December conditions at -29°C.

The Solution

Eco-Dam systems installed with glycol circulating units to maintain operability at -29°C. Full creek diversion executed to support dredging operations clearing vegetation obstruction.

The Outcome

Creek diversion and dredging completed in extreme cold. Wetland water volume capacity restored, reducing downstream flood risk during spring thaw and heavy rainfall events.

Fort McMurray Ice Jam Flood Protection

The Challenge

Post-ice-jam flooding threatened residential and commercial areas. A large-scale proactive deployment was required before flood waters arrived.

The Solution

Eco-Dam water-filled systems deployed proactively across exposed areas, providing stabilization against low-flow, standing, and fast-rising water conditions simultaneously.

The Outcome

Properties protected ahead of the flood event. Deployment confirmed Eco-Dam’s versatility across the full range of water rise scenarios.

Scroll to Top